News
New turbine for HPP Vír 1 with generator G&Em
28.10.2022A third turbine/generator assembly was added to HPP Vír 1.
The document about modernization can be seen at this link (in Czech only):
A third turbine/generator assembly was added to HPP Vír 1.
The document about modernization can be seen at this link (in Czech only):